CONSTRUCTION SITE LAYOUT PLANNING THE PROBLEM 1/1

Failure to plan the site layout in advance is a prime cause of operational inefficiency, and can increase the overall cost of a project substantially. In the absence of a precise site layout plan, the following problems may occur: 
Material stacks wrongly located. Materials arriving on site are off-loaded into what someone guesses to be the correct location. This problem may involve double or triple handling of materials to another location. For example: 
- They may stocked over a drainage line or near the edge of excavation; 
- They are too far from the work area; 
- They are too remote from the hoist or not within the radius of the crane; 
- They impede the smooth flow of work traffic across the site; 
- Their delivery was wrongly phased and they are not needed until much later in the 
project; 
- They are fragile. 